Send Message
Home > products > Excavator Undercarriage Parts >
DC60 Combine Harvester excavator rubber track/Rubber crawler/rubber track chassis

DC60 Combine Harvester excavator rubber track/Rubber crawler/rubber track chassis

Place of Origin:

Guangdong, China

Brand Name:

HF

Certification:

Iso9001 CE

Model Number:

ANY

Contact Us
Request A Quote
Product Details
Condition:
New
Applicable Industries:
Other, Machinery Repair Shops, Energy & Mining, Construction Works
Warranty:
6 Months
Color:
Black
Process:
Forging /casting
Moving Type:
Crawler Excavator
Type:
Excavator Undercarriage Parts
Name:
Undercarriage Excavator
Keyword:
Rubber Track
Delivery Time:
2-5days
Payment:
T/T, L/C
Port:
NANSHA,GUANGZHOU,YIWU,SHISHI...
Payment & Shipping Terms
Minimum Order Quantity
2 pieces
Price
$350.00 - $750.00/pieces
Packaging Details
Pallet, wooden case, plastic film packaging or custom packaging
Delivery Time
within 3 days after receiving payment
Payment Terms
T/T, L/C
Supply Ability
10000 Piece/Pieces Month
Product Description

  • Products Features

 

1.Product Name: Excavator Rubber Crawler Track
2.Color: Black
3.Material: Natural Rubber & Alloy Steel
4.Product Price: Best price(Consult customer service for detailed quotes)
5.Product Type: Rubber Track For Construction Machinery
6.Application: Excavator;Small Digger(confirm with me about other machine)
7.Specification: Customizable(please contact customer service to provide Size)
8.Warranty: Normal Use For 1 Year Guarantee
9.Feature: Wear-Resistant, Heat-Resistant,Corrosion-Resistance, Tear-Resistant,High precision,Long Life

 

Type of rubber tracks:


1). Continuous rubber track
2). Interchangeable Rubber Track
3). Short Pitch Rubber Track
4). Conventional type or interchangeable type rubber track
5). Warranty: guarantee one year under normal use
6). Application: mini-excavator, bulldozer, dumper, crawler loader, crawler crane, crawler carrier vehicle, agriculture machinery,paver and other special machine

 

DC60 Combine Harvester excavator rubber track/Rubber crawler/rubber track chassis 0

 

DC60 Combine Harvester excavator rubber track/Rubber crawler/rubber track chassis 1

How to Measure Rubber Tracks?


To check for the size of your existing rubber track you will need to measure followings.

* Measure the width of the track in millimeters or we can do the conversions for you. (1 inch = 25.4 millimeters)
* Measure the distance from the top of the center of one link (metal piece that engages with the sprocket on the track) to the
top of the center of the next link (in millimeters or we can do the conversions for you). This distance is known as the pitch
of the track.
* Count the total number of links (also called metal pieces or lugs) inside of the track.
* The measurement of a track is Width x Pitch x Links.

Rubber Track Tread Patterns and OEM Track Sizes

A wide range of track designs and track patterns are available for specific machine applications and working conditions. Ask one of our professional sales associates which patterns are available for your machine.

 

DC60 Combine Harvester excavator rubber track/Rubber crawler/rubber track chassis 2
DC60 Combine Harvester excavator rubber track/Rubber crawler/rubber track chassis 3
DC60 Combine Harvester excavator rubber track/Rubber crawler/rubber track chassis 4

Other machinery and models are available

 

DC60 Combine Harvester excavator rubber track/Rubber crawler/rubber track chassis 5

Width*Pitch

(mm)

Pitch

number

Width*Pitch

(mm)

Pitch

number

Width*Pitch

(mm)

Pitch

number

130*72 28-53 KB300*52.5 72-92 400*74 68-76
150*60 28-49 KB300*52.5N 72-98 400*75.5K 74
150*72 29-40 JD300*52.5N 72-98 B400*86 52-55
170*60 30-40 300*53K 80-84 400*90 42-56
180*60 30-40 300*55 70-86 Y400*107K 46
180*72 30-58 300*55.5K 76-82 K400*142 36-37
180*72K 30-37 300*71K 72-55 400*144 36-41
B180*72K 34-51 300*109N 25-42 Y400*144K 36-41
B180*72A 30-51 300*109W 35-44 420*100 50-58
H180*72 30-50 K300*109 37-41 450*71 76-88
190*60 30-40 300*109WK 35-42 DW450*71 76-88
190*72 34-39 B300*84 78-52 450*73.5 76-84
200*72 34-47 T300*86K 48-52 450*76 80-84
200*72K 37-47 320*52.5 72-98 450*81N 72-80
230*48 60-84 B320*52.5 68-98 450*81W 72-78
230*48K 60-84 320*54 70-84 KB450*81.5 72-80
230*72 42-56 B320*55K 77-98 K450*83.5 72-74
230*72K 42-56 B320*84 50-53 Y450*83.5K 72-74
230*96 30-48 T320*86K 48-52 B450*84 53-56
230*101 30-36 B320*86 49-52 B450*86 52-55
250*47K 84 320*90 52-56 450*90 58-76
250*48.5K 80-88 320*100 38-54 KU450*90 58-76
250*52.5K 72-78 320*100W 37-65 T450*100K 48-65
250*52.5 72-78 Y320*106K 39-43 K450*163 38
250*72 47-57 350*52.5 70-92 485*92W 74
B250*72 34-60 350*54.5K 80-86 500*90 76-82
B250*72B 42-58 B350*55K 77-98 500*92 72-84
E250*72 37-58 350*56 80-86 500*92W 78-84
250*96 35-38 350*75.5K 74 500*100 71
250*109 35-38 350*90 42-56 K500*146 35
260*55.5K 74-80 350*100 46-60 600*100 76-80
Y260*96 38-41 350*108 40-46 600*125 56-64
260*109 35-39 350*109 41-44 700*100 80-98
280*72 45-64 Y370*107K 39-41 750*150 66
Y280*106K 35-42 400*72.5N 70-80 800*125 80
300*52.5N 72-98 400*72.5W 68-92 M800*150 66-68
300*52.5W 72-92 Y400*72.5K 72-74 K800*150 67-70
300*52.5K 72-84 KB400*72.5K 68-76 1000*150 86
300*52.5KW 72-92 400*72.5KW 68-92    
 

  • Production Flow Processing and inspection

 

1. Assemble the frame slide rails. Start by assembling the wheels (made of plastic and rubber) and the axle hitch, taking advantage of the mobility of the rubber wheels to mark and complete the assembly. Then, install the turnbuckle on the frame slide rail to tighten or loosen the rubber track.


2. Assemble the driving wheel assembly. Including the installation of the moving motor, the addition of heavy load transfer and the installation of the support plate. The assembly of the driving wheel assembly and the frame slide rail requires lubricant to facilitate installation.


3. Preforming. Place the extruded rubber material that meets the requirements on the core gold pitch template, and insert the specified quantity and specification of core gold to produce standard quality molded parts.


4. Vulcanization. The vulcanization process includes long mold vulcanization and ring joint vulcanization. In long mold vulcanization, semi-finished parts are loaded into the mold in a specific sequence and quality adjusted. Ring joint vulcanization involves removing the rubber edge of the unvulcanized or semi-vulcanized portion of the belt body and vulcanizing the joint.


5. Glue wrapping machine. When using a winding machine to produce steel cord, it is necessary to strictly control the glue concentration to ensure that the steel cord does not have glue shortage, yellowing, steel wire bending and overlap.


6. The extruder is coated with glue. During the coating process of the extruder, it is necessary to ensure that the coating tension is uniform, the width and thickness comply with construction standards, and the steel wires are arranged neatly.


7. Complete assembly and testing. Finally, all systems are tested to ensure the machine is functioning properly. After the test was completed, the engine was cranked to top speed until it reached proper operating temperature, showing that everything was operating as designed.

 

 

  • Company Strength

 

 

DC60 Combine Harvester excavator rubber track/Rubber crawler/rubber track chassis 6
 

   Guangzhou Haofeng Scm Co., Ltd. is located in Nansha District, Guangzhou.Our company is a professional supplier of machinery parts, suitable for Caterpillar, Hitachi, Hyundai, Kobelco, Komatsu and other brands.We are committed to providing used excavator, excavator parts and Customized mechanical accessory. We have a large independent factory,100 employees, 15 sets of equipment and 4 production lines. We are both a supplier and manufacturer of mechanical engineering accessories.Our goods are delivered directly from the factory to customers with low price and good quality.

 

DC60 Combine Harvester excavator rubber track/Rubber crawler/rubber track chassis 7
DC60 Combine Harvester excavator rubber track/Rubber crawler/rubber track chassis 8

  • Customer Photos

 

DC60 Combine Harvester excavator rubber track/Rubber crawler/rubber track chassis 9

 


  • Packaging And Shipping

 

We supervise the process from the factory to the port designated by the customer to ensure that the customer's products arrive at the destination accurately and safely.
 
1.By Bulk Shipment,the machine is placed on the deck.
2.By Ro Ro Shipment,the machine is placed in the cabin.
3.By Flat Rack Container Shipment.
 
DC60 Combine Harvester excavator rubber track/Rubber crawler/rubber track chassis 10
 

  • FAQ

     

    Q: Why should you buy from us not from other suppliers?

     

    A:We have two companies and one factory, the price and quality are very advantageous. Our team has 20 years of experience in the machinery industry.

     

    Q: How long is your delivery time?

     

    A: Generally it is 10 days if the goods are in stock. or it is 20-30 days if not in stock. If it is customized,it will be confirmed accord ing to order.

     

    Q: What about Quality Control?

     

    A:We have excellent tester, check every piece to ensure the quality is good, and check the quantity is correct before the shipment.

     

    Q: What is your terms of payment?

     

    A: T/T 30% as deposit, and 70% before delivery,Terms Trade have CIF ,CFR,FOB,etc.

Send your inquiry directly to us

Privacy Policy China Good Quality Excavators Spares Supplier. Copyright © 2024 Guangzhou Haofeng Supply Chain Management Co., Ltd . All Rights Reserved.