Place of Origin:
China
Brand Name:
Other
Model Number:
K3V112DTP-9N62
K3V112DTP-9N62 Hydraulic Pump For Hyundai R215-9T R225-9T R275-9T Big Hole Design
Product Introduction
Discover the K3V112DTP-9N62 Hydraulic Pump, a premium aftermarket replacement for Hyundai R215-9T, R225-9T, and R275-9T excavators. Engineered for seamless compatibility, this main pump ensures peak efficiency in demanding construction, mining, and earthmoving tasks. Its advanced "Big Hole Design" optimizes fluid dynamics, enhancing oil flow, reducing pressure drops, and minimizing cavitation. This design also improves heat dissipation, preventing overheating during intensive operations, extending pump lifespan, and ensuring consistent power delivery for improved productivity and reduced downtime.
Crafted from high-grade materials with precision-machined components and robust seals, this pump offers exceptional durability and wear resistance. Each unit undergoes rigorous quality testing, including pressure and flow validation, to meet or exceed OEM specifications for performance and reliability. This ensures reliable operation in harsh environments and heavy workloads.
This cost-effective pump provides a direct fit, simplifying installation and minimizing modifications, allowing quick equipment turnaround to maintain project timelines and profitability. Ideal for replacing worn units or stocking spares, the K3V112DTP-9N62 delivers consistent power, precise control, and long-term durability. Invest in a pump that keeps your Hyundai excavators productive and reliable, ensuring smooth operation under challenging conditions with exceptional value.
Product Paramenters
Displacement ml/r | 97X2 |
Excavator Ton | 20-22 |
Control way | Open |
Rated speed r/min | 2230 |
Input Pressure Mpa | 0.1~0.34 |
Max Pressure Mpa | 37.2 |
Teeth | 12 |
Dimension/weight cm/kg | 68.5*25.9*33/138 |
Direction | R |
Self-priming max speed r/min | 2360 |
Rated Pressure Mpa | 34.3 |
Color | Black |
FAQ
Q: Why should you buy from us not from other suppliers?
A:We have two companies and one factory, the price and quality are very advantageous. Our team has 20 years of experience in the machinery industry.
Q: How long is your delivery time?
A: Generally it is 10 days if the goods are in stock. or it is 20-30 days if not in stock. If it is customized, it will be confirmed according to order.
Q: What about Quality Control?
A:We have excellent tester, check every piece to ensure the quality is good, and check the quantity is correct before the shipment.
Q: What is your terms of payment?
A: Accepted T/T.L/C.Western Union etc;
Accepted payment currency: USD, EUR, RMB;
Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance, balance before shipment.
Q: How to order?
A:Tell us the machine model, part name, part number, quantity for each item, and then we can send a professional quotation sheet.
Send your inquiry directly to us